News
Road re-opened following successful bridge replacement
PEMBROKE ROAD in Merlins Bridge, Haverfordwest, has re-opened and train services between Whitland and Milford Haven have resumed as normal, following the successful replacement of Pembroke Road railway bridge this weekend.
Over the weekend, Network Rail teams worked around the clock to demolish and remove the existing railway bridge deck – which carries the South Wales Main Line. Engineers then installed a new, steel structure which includes a concrete collision beam to provide extra resilience, as part of Network Rail’s Railway Upgrade Plan to improve the reliability of the railway.
Rhys Howells, scheme project manager for Network Rail Wales and Borders, said: “We would like to thank residents and rail passengers for bearing with us whilst we replaced Pembroke Road railway bridge.
“The previous bridge deck was nearing the end of its serviceable life, and has now been replaced with a more resilient structure which will help to keep the railway in West Wales running reliably.”
Next month the second part of this £4.25m upgrade project will see engineers replace Milford Road railway bridge.
The A4076 at Milford Road railway bridge on Dredgeman Hill will be closed from 7pm on Friday 15 until 6am on Monday 18 February and a fully signposted diversion route will be in operation.
Residents and local businesses wishing to find out more about the work to Milford Road railway bridge are invited to attend a ‘drop-in’ event on Thursday 31 January from 3pm to 6pm at the Merlins Bridge Welfare Hall, Pembroke Road, SA61 1JW. No appointment is necessary and representatives from Network Rail’s project team will be on hand to provide information and answer any questions.
You can also find out more information about this essential upgrade project here: www.networkrail.co.uk/Merlins-Bridge.
News
Major traffic jams following accident on M4 near Swansea
A ROAD traffic accident has closed the M4 in both directions as of Tuesday morning (Mar 19).
Police, paramedics and the fire service were called to the scene of the crash on the eastbound carriageway between Pont Abraham and Hendy at 23:20 GMT on Monday.
A fire which had broken out was extinguished before they arrived.
The motorway remains closed in both directions between J48 and J49.
The affected section is between junction 49 Pont Abraham and junction 48 Hendy, Llanelli, in Carmarthenshire.
As of 8.30am there were 45-minute delays with Traffic Wales saying: “Road continues to remain closed.
https://x.com/DyfedPowys/status/1769963608048378117
“Busy in the area delays showing as approximately 45 minutes in the surrounding areas. Please allow additional time for travel and thank you for your patience.”
Traffic monitors are showing there is already slow traffic in the area and congestion.
There are delays on surrounding routes in the area and on the A48.
News
Dredging work set for Tenby Harbour
TENBY HARBOUR and North Beach users are being asked to be aware of heavy moving machinery from Tuesday March 26 th to Friday 29 th as dredging work is carried out.
Sand will removed from the mouth of the Harbour and deposited at the north end of the beach. The work will not affect vessel movements at the Harbour.
Tenby Harbourmaster Chris Salisbury said a licence for the dredging had been issued after several months of application work.
“We ask that the public please keep clear of the operating area and that dogs are kept on a lead during this time,” Chris added.
Cllr Rhys Sinnett, Cabinet Member for Residents’ Services, said: “I’m grateful to our officers for securing the licence for this work to go ahead. This dredging is essential
for the operation of Tenby Harbour.
“The timing of the work has been governed by the tide and the dates represented the last opportunity for the work to be carried out before the boats are placed back in the
water.”
News
Closure of Tata Steel’s coke ovens sparks political and union backlash
THE recent announcement by Tata Steel to close the coke ovens at its Port Talbot plant in South Wales has ignited a firestorm of political and industrial action, highlighting the deepening crisis within the British steel industry and the challenges facing the transition to green steel.
Jo Stevens MP, the Shadow Welsh Secretary, expressed her concerns over the impact of the closure on the Welsh steel industry and the workers affected. Stevens emphasized the need for assurances about the workers’ immediate future and pledged that a UK Labour government would invest in the steel industry to support the transition to green steel, harnessing the skills, talent, and ambition of Welsh steelworkers.
The closure, slated for Wednesday due to concerns over the ovens’ “operational stability,” has been criticized by regional Senedd Members for South Wales West, Tom Giffard MS, and Dr. Altaf Hussain MS. They accused the Labour Welsh Government of neglecting its support for the Tata Steelworks in Port Talbot, highlighting a lack of financial assistance since 2019 and calling for a change in response to the current developments.
Unite, the UK’s leading union, has been vocal in its opposition to Tata’s decision, describing it as a shock and a “result of years of betrayal.” The union criticized Tata for not disclosing the imminent risk of closure during recent consultations and announced a ballot for industrial action among 1,500 Tata workers. Unite insists there should be no job losses at Port Talbot or Llanwern and that a blast furnace should remain operational.
Peter Hughes, Unite’s regional secretary for Wales, called for Tata to halt its closure plans in anticipation of Labour’s promised £3 billion investment to rejuvenate the UK steel industry. He accused Tata of managing the decline of UK steel while accepting government subsidies, describing the company’s actions as “deliberate industrial vandalism.”
The closure has not only raised concerns about the future of steel production in the UK but also spotlighted the political and economic strategies required to ensure the industry’s survival and transition towards more sustainable practices. The unfolding situation underscores the need for a collaborative approach between the government, industry stakeholders, and the workforce to navigate the complex challenges ahead.
-
Community6 days ago
Two Welsh codebreakers who helped shorten WWII celebrate their 100th birthdays
-
Community1 day ago
Residents hit back after YouTube video shows Milford ‘in decline’
-
News16 hours ago
Air ambulance called following incident at Aldi Pembroke Dock
-
Crime6 days ago
Local carer admits defrauding client by more than £7,000
-
Crime6 days ago
Dramatic arrest of three men after man hospitalised in assault
-
News5 days ago
Pembroke Dock grants scandal: A decade of deception unravelled
-
News6 days ago
Llŷr Davies, 16, was kind, funny and charming, says bereaved family
-
Crime7 days ago
Neyland motorist caught driving Mercedes four times over the limit