Business
Controversial ferry Norbay departs Pembrokeshire for final time
A CONTROVERSIAL and passenger-unfriendly ferry that has operated on one of Pembrokeshire’s Irish Sea routes this winter has sailed out of the county for the last time.
The economy charter ferry Norbay was introduced on the Pembroke to Rosslare run by Irish Ferries at the end of January. The 17,464-tonne P&O vessel quickly became unpopular with passengers due to its limited facilities, lack of lifts, and refusal to accommodate foot passengers or cyclists.
Last month, Irish Ferries confirmed that Norbay would be replaced on the route by the roll-on, roll-off cruise ferry, the Isle of Innisfree. Andrew Sheen, managing director at Irish Ferries, commented, “The addition of the Isle of Innisfree on the Rosslare-Pembroke route is a sign of our ongoing commitment to these routes, and ensuring we offer our freight and passenger customers quality service for these important connections between Britain and Ireland. We look forward to welcoming passengers on board to experience our award-winning hospitality and service.”
The Isle of Innisfree, built in 1992, has a capacity for 1,140 passengers, 83 freight vehicles, or 600 cars. However, it is not scheduled to sail from Pembroke until the end of this month, as it is currently operating on the Dover to Calais route.
In the interim, the gap has been filled by the temporary return of the Oscar Wilde, which was Norbay’s predecessor on the Pembroke to Rosslare route for six months. With space for 2,080 people, Oscar Wilde boasts the largest passenger capacity of any vessel on the Irish Sea. It took over the Pembroke to Rosslare sailings from Norbay at the beginning of June and is scheduled to operate on the route until Thursday, 27 June.
The Isle of Innisfree will then commence its service on the route, making its first sailing on Friday, 28 June.
The replacement of Norbay and the recent management changes at Stena Line, which operates out of Fishguard, have been hailed as ‘enormously positive’ developments for ferry services between Pembrokeshire and Ireland.
Business
Narberth 91 homes estate approved despite traffic concerns
PLANS for an estate of 91 houses, more than 40 per cent of them affordable, in a Pembrokeshire town have been backed despite concerns about road safety and the ability of the town’s infrastructure to cope.
In an application recommended for conditional approval at the December meeting of Pembrokeshire County Council’s planning committee, Wales & West Housing Association sought permission for 91, one, two, three and four-bedroomed homes on land to the north of Adams Drive and to the west of Bloomfield Gardens, Narberth.
28 affordable homes are proposed, along with 12 houses as Low-Cost Home Ownership Units, the remaining 51 homes for open market sale, the meeting hearing the affordable units would have a local letting policy.
Agent Asbri Planning Ltd, in a supporting statement, said: “The design led approach will create a high-quality place, that sensitively sits within the site retained wildlife corridors and positively connects to the community of Narberth.”
It added: “The development of a mixed tenure site for different types of homes will cater for a variety of local people. These include first-time buyers, growing families looking to move up the property ladder, those looking for bungalows or to downsize for their retirement.
“As indicated approximately half of the homes proposed will be for social rent or offered for sale as part of a discounted home ownership scheme for local people who want to buy their own home but cannot afford the high cost of houses in Narberth.”
The discounted sale properties will be delivered via Wales & West Housing’s ‘Own Home Cymru’ scheme which helps buyers with a local connection to purchase a home of their own at 70 per cent of market value without the need for a deposit.
Narberth Town Council has raised concerns about site access and the ability of the town’s infrastructure to cope with the additional homes.
Some 16 letters of concern were also received by planners, issues including site access concerns and safety, the traffic should be more equally split between the two sites, and the scheme exacerbating gridlock conditions already experienced on the town centre one-way system.
Concerns were raised at the meeting by local resident – and former county councillor – Vic Dennis, speaking on behalf of local residents, Mr Dennis echoing concerns about the site access layout, asking members to reject the scheme unless planners would look at alternate links to the development.
Local member Cllr Marc Tierney welcomed the additional housing but reflected the traffic concerns, saying said the town’s one-way system was already exhibiting difficulties.
The application was conditionally backed with delegated powers given to the head of planning to approve.
Business
Pure West Radio brings festive cheer with ‘Pure X-Mas’ on DAB
PEMBROKESHIRE residents can now enjoy the perfect festive soundtrack as Pure West Radio launches its dedicated Christmas station, “Pure X-Mas,” on DAB radio. Running from Saturday (Nov 30) to New Year’s Eve, the station promises nonstop Christmas music and holiday cheer for all listeners.
“Pure X-Mas” offers an exciting mix of timeless classics and modern holiday hits, creating a joyful atmosphere for decorating trees, wrapping presents, or simply enjoying the season.
Station Manager Toby Ellis said:
“This Christmas, we’re making it easier than ever for Pembrokeshire and beyond to tune into the magic of the season. Pure X-Mas on DAB is our gift to the community – a station entirely dedicated to spreading festive joy and creating lasting memories.”
Exclusively available on DAB, “Pure X-Mas” guarantees crystal-clear sound and easy access for listeners across North and South Pembrokeshire. Simply tune your DAB radio to Pure West Radio’s dedicated Christmas station and immerse yourself in the spirit of the season.
Business
Decision on Trewern Farm building plans delayed until 2025
A CALL to let a 950-herd north Pembrokeshire dairy farm to keep a farm shed built without permission a decade ago which was expected to be approved has instead been put on temporary hold, national park planners heard.
In an application recommended for conditional approval at Pembrokeshire Coast National Park’s development management committee meeting of December 4, Trewern Farms Ltd is seeking permission for the retention of the agricultural building and lay down area at Trewern Farm, Felindre Farchog.
The application is part of a wider complex planning history associated with the site.
A report for Park planners says: “Trewern Farm is operated as a zero grazing style dairy farm with 304 hectares located on two separate parcels of land, one at Trewern with the remainder being at Penpedwast, adjacent to Castell Henllys. The farm has a dairy herd of approximately 950 cows.
“Trewern Farm has expanded significantly over recent years with many of the buildings and structures on site having been erected without the prior benefit of planning permission, and having since been regularised through a combination of retrospective applications and certificates of lawfulness.
“The building subject of this application is believed to have been constructed in 2014. The site currently comprises an agricultural shed immediately adjoining another shed and is used for cubicle housing.
“A slurry lagoon, silage clamps and 12 of the newer agricultural buildings are now lawful as Certificates of Lawfulness were granted for these whilst the Authority was awaiting an Environmental Impact Assessment to be submitted by the applicants for the 2015 planning application to regularise the unauthorised buildings.
“However, this is the last of the outstanding agricultural buildings which are not lawful, and an enforcement notice was served in May 2018 requiring its removal. This notice was appealed in November 2019 and is currently being held in abeyance by the Planning Inspectorate.”
It says the building referred to in the application “is described as being designed to house cattle in a series of cubicles, and forms part of a longer set of buildings running along the southern section of the farming complex,” adding: “The livestock numbers are not proposed for increase as a result of this application but will be as secured [by a planning consent] restricted to no more than 960 milking cows with 1020 maximum excluding calves.”
Local community council Nevern has said it has “grave concerns” about the application, asking, amongst other things, how the 960 cattle limit will be policed and the important woodland will be protected.
At the December 4 meeting, planners were told the application would be deferred to a future meeting as not all received documentation had been published on the national park’s planning website.
The application is expected to return to the January meeting, committee chair Madelin Havard offering her apologies to the applicant for the delay.
-
News7 days ago
Local MP’s family avoids farm tax bombshell
-
Sport7 days ago
Local Angharad James-Turner leads Cymru in historic Euro ’25 play-off final
-
featured4 days ago
Teenager killed herself after ten months of hell, says heartbroken mum
-
Top News4 days ago
Top international artist brings solo exhibition to North Pembrokeshire gallery
-
Crime3 days ago
Former police officer appears in court over paddleboarding deaths
-
News7 days ago
Illegal workers fine of £120,000 for Haverfordwest car wash
-
Advertorial7 days ago
André Rieu’s 2024 Christmas Concert
-
Community6 days ago
Haverfordwest shines bright at Riverside Winter Fair