Business
Openreach gear up to bring ultrafast speeds back to Pendine
OPENREACH is starting work to build a new ultrafast broadband network for Pendine in Carmarthenshire – giving both residents and businesses access to some of the fastest, most reliable broadband available.
The once-in-a-generation, full fibre broadband upgrade will let locals connect multiple devices at gigabit-capable speeds and help businesses trade online and compete for decades to come.
Pendine, known for its rich history and breathtaking landscapes, is a vast 7 mile stretch of beach where numerous World Land Speed record attempts have taken place over the years. From Sir Malcolm Campbell’s first land speed record of 146.16 miles per hour (mph) in his “Blue Bird”, Welshman J.G. Parry-Thomas’ record attempts in “Babs” to more recent World records set by Guy Martin and Idris Elba.
And now the small coastal Carmarthenshire village’s connection to speed will be complemented with some of the fastest broadband speeds in Europe.
Made possible as a result of Openreach’s Fibre Community Partnership Scheme, Pendine residents have applied for and pooled together free UK Government broadband vouchers that has gone towards the cost of the build.
Engineers have started work and the ultrafast broadband is expected to reach the majority of local homes and businesses throughout 2024. But more vouchers need to be pledged to ensure that the more rural parts of Pendine don’t miss out.
Full fibre broadband provides more reliable, resilient and future-proof connectivity; with fewer faults; more predictable, consistent speeds and enough capacity to easily meet growing data demands.
Residents can enjoy a host of online services and entertainment, with seamless streaming and smooth online gaming. The technology also supports day-to-day, business critical tasks like video calls, banking and online customer interactions.
Martin Williams, Openreach Partnership Director for Wales, said: “This is a really exciting opportunity for people living and working in Pendine and we’re delighted to be able to bring all the benefits of ultrafast, ultra-reliable Full Fibre broadband to the community.
“Our Fibre Community Partnership programme has meant that we’ve been able to bring thousands of additional properties across Wales and the rest of the UK into our Full Fibre build plans. But building out the network to these harder to reach locations is still challenging – which is why it’s only possible with everyone working together – you, your neighbours and Openreach.
“We still need more pledges in Pendine to ensure we can go even further to those properties that are on the outskirts of the village so would urge people to get involved and not miss out.”
County Cllr. Jane Tremlett, Member for Laugharne Township Ward, said “Knowing this local community and understanding it’s frustrations with having poor broadband connectivity for many years, the work that has started to improve that, is absolutely welcomed.”
“Our rural communities should have the same access as our towns, to maintain their social inclusion in society and having decent broadband is integral to that. It’s great that residents have been able to apply for government vouchers, making sure that the installation bears no cost to them and I look forward to hearing about the benefits once the infrastructure is live.”
Openreach has identified around 25,000 homes and businesses in 50 communities across Wales as being within scope for Full Fibre as part of the scheme and is urging local people to take the next step by applying for and pooling together free Government Gigabit Vouchers to help fund the build.
If enough people sign up, they will join around 900, 000 homes and businesses across Wales who already have access to full fibre broadband.
Funding through the UK Government’s Gigabit Broadband Voucher Scheme and the deployment of innovative engineering techniques, means thousands more remote, rural and coastal communities like Pendine are now within reach of the ultrafast technology.
Similar to Pendine, residents can check if they qualify and pledge their voucher on the Connect My Community website. Using the vouchers – which don’t cost residents anything, enables Openreach to work with a local community to build a customised, co-funded network.
Once enough people pledge and validate their vouchers, Openreach engineers will start the build. This can take up to 12-18 months, and some properties may go live before others.
You can find out more about the benefits of an upgrade to Full Fibre broadband on the Openreach website.
Business
New showroom for car dealership approved by county planners
PLANS for a new showroom for a Pembrokeshire car dealership which has recently acquired a new Isuzu vehicle franchise, have been given the go-ahead.
In an application to Pembrokeshire County Council, Gareth Hughes Motors of 25 Burton Road, Sardis, through agent Hayston Developments & Planning Ltd, sought permission to replace a temporary canopy with fixed permanent mini-showroom.

A supporting statement said: “Gareth Hughes Motors is a family run enterprise, established in 1982. In order for the business to respond to the latest technological advancements, especially those related to the transition to hybrid and electric vehicles, additional space and different resources will be required.
“Approval of this application will assist in the delivery of these required resources, associated staff training and recruitment for the servicing of electric vehicles will also lead to the retention and provision of skilled employment.”
It says the extension will be designed to allow sufficient space to display Isuzu vehicles, an additional motor franchise recently acquired by the dealership, with no changes proposed to the existing access from the C3007 as the mini-showroom would take place to the rear of the site and replace an existing canopy structure.

It added: “The environmental impacts from the proposal are minimal as the replacement structure takes place on a concreted/bitumac surface which is currently used for the parking of cars. In addition, the design and use of materials complements that of the current showroom and repair shop and by the addition of a bird and bat box on the south-east of the proposed extension.
“The proposed new mini-showroom will accommodate a maximum of two vehicles and would take place to the rear/side of the site and would be constructed in materials which complement those of the existing showroom and service bays.
“Although Gareth Hughes Motors is located within a group of residential properties it is considered that there will be no significant negative impacts on those neighbouring properties because of their distance from the application site, the orientation of the buildings.
“The securing of an additional franchise at this Sardis site will both help secure the future of the existing staff and create opportunities for additional employment in the motor trade.”
The application was conditionally approved by county planners.
Business
The Cheesecake Guy Ltd plans withdrawn following community council objections
PLANS for what could have been the third store in the country for Welsh cheesecake business The Cheesecake Guy Ltd at Saundersfoot’s Coal Building interpretation centre have been withdrawn.
In an application to Pembrokeshire Coast National Park, Craig Taylor of Merthyr Tydfil-based The Cheesecake Guy Ltd sought a change of use of part of Saundersfoot’s Cambrian Terrace Coal Building interpretation centre to create a small retail unit.
On its website, The Cheesecake Guy says of its business and products: “Established in 2019, The Cheesecake Guy is all about delivering indulgent, handcrafted cheesecake desserts with a twist. While we offer a range of sweet treats, our specialty — and customer favourite — is the signature cheesecake jar.
“Made with quality ingredients and packed with rich, creamy layers, our jars are the perfect dessert for any occasion. Whether you’re treating yourself or sharing with others, The Cheesecake Guy brings a spoonful of happiness to every bite.”
While no supporting statement was published for the Saundersfoot proposal, the application said the scheme, if approved, would employ two full-time members of staff, operating 10am-6pm Mon-Sat, and 10-5 on Sundays and bank holidays.
Of the scheme itself it said it would involve “retail sales of pre-prepared desserts and merchandise,” adding there will be “no on-site manufacturing or heavy processing,” with “equipment limited to display fridges and freezers”.
If approved, the Saundersfoot site would have been the third outlet for The Cheesecake Guy, with sites in Merthyr, and, more recently, Newport Market.
For its Newport site, The Cheesecake Guy says: “We specialise in creating a wide variety of cheesecake desserts that cater to all tastes. Our menu features popular favourites that have won the hearts of many, alongside exciting new creations designed to keep your taste buds satisfied.
“Whether you’re a classic cheesecake lover or an adventurous foodie, we promise a cheesecake experience like no other. Each cheesecake is made with the utmost care, ensuring a rich, creamy texture and a burst of flavour in every slice (or jar!).”
Since the application was submitted, Saundersfoot Community Council objected “on the basis that the harbour is diluting the original intention of this area, which was designed to be an educational section of the development”.
The application is now, as of June 19, marked as withdrawn.
Business
Amended Fishguard children’s home scheme approved
AN AMENDED scheme for a children’s care home on the edge of Fishguard has been approved after a previous call was refused.
In an application to Pembrokeshire County Council, Martin Leahy of Ty Caredig Ltd sought a certificate of lawfulness permission for the use of a dwellinghouse to a residential care home for up to two children at Bryn Delyn, Y Fraich, Fishguard.
Last November, a similar call to allow Bryn Delyn to be used as a children’s home, which raised fears from local objectors the scheme was being ‘rubber stamped’ by the council, was refused.
In that application to the council, Cardiff-based Ty Caredig Ltd sought permission for a Certificate of Lawfulness on the basis the use was not materially different from the property’s existing lawful use.
Residents had accused the council of “pushing through a highly controversial children’s home application behind closed doors”.
A supporting statement for that scheme, with many redacted parts, said the four-bed property had a lawful use as a dwelling house; saying the use as a care home did not require planning permission through a change of use.
However, planners said the use of the dwelling as a care home “would represent a material change of use requiring the benefit of planning permission”.
Since then, amendment to the scheme, for a lawful change of use was submitted, a supporting statement saying Ty Caredig Ltd operates homes throughout Wales that provide specialist care for children, the latest scheme “seeks formal confirmation that the proposed use of Bryn Delyn as a children’s care home for up to two children (plus care staff) would not require planning permission”.
Fishguard Town Council objected, on the grounds of highway safety and parking issues.
It also raised points of “apparent discrepancies between the planning application and the information available on the website,” but stressed it did support provision of suitable accommodation for vulnerable young people and children “with the correct infrastructure in place”.
Local county councillor Cllr Par Davies has said the scheme has her “full support,” as did the certificate call, adding: “Rumours abound regarding this application with objections concerning the usage of the property as a care home for young people. The application states that only two young people would be cared for in the property.
“This type of property is needed as we often talk as councillors for the need for Pembrokeshire children in care to remain in Pembrokeshire instead of the alternative of moving them to other areas in the country and this application fulfils that need.”
The application was approved by planners, the approval stating “Based on the information submitted and on the balance of probability it is considered that the use of the property as a residential care home for up to two children would not result in a material change of use from the lawful use of the property as a dwellinghouse and as a result a certificate of lawfulness for a proposed use should be granted.”
-
Community7 days agoPembrokeshire Chess Club crowned Welsh champions
-
Crime3 days agoMilford Haven man jailed for breaching domestic violence protection order
-
Local Government5 days agoSecurity privately arranged by Mayor at Beating of the Bounds
-
News3 days agoCrash on Freeman’s Way causes school-run chaos across Haverfordwest
-
Crime5 days agoMan wanted by court after failing to attend hearing over alleged shop thefts
-
Crime5 days agoMan banned from roads after drink-driving offence
-
Crime5 days agoMan jailed after admitting strangulation and assaults
-
Crime5 days agoMan sentenced over stalking campaign and lock knife offence






