News
Ledwood commences £13m contract for Europe’s largest LNG terminal expansion
PEMBROKE DOCK-based Ledwood Mechanical Engineering has embarked on a significant venture to enhance the capacity of Europe’s largest Liquified Natural Gas (LNG) terminal situated on the Isle of Grain. This £13 million contract, executed on behalf of a VINCI Joint Venture (EVT), aims to fabricate 300 tonnes of steel and 280 linear meters of pipework, followed by on-site installation and testing, leading to the creation and protection of up to 65 jobs.
The focal point of this ambitious project is the establishment of a 190,000 cubic meters (M3) LNG reservoir as part of the overarching program to expand Europe’s preeminent LNG terminal. The new full containment tank, akin in size to the illustrious Royal Albert Hall in London, will encompass a 9 per cent nickel steel inner tank encased within a pre-stressed concrete outer shell.
Liam Revell, the Commercial Director for Ledwood, shared his thoughts on the project’s magnitude, stating, “Having played a pivotal role in the construction of the UK’s first three LNG import terminals at South Hook, Dragon, and the Isle of Grain, we bring our expertise in project management, manufacture, and installation of pipework, tanks, and mechanical engineering to the LNG sector.”
Grain LNG boasts approximately 1,000,000 cubic meters of LNG storage capacity spread across eight tanks, solidifying its position as the UK’s premier gateway for connecting global LNG to the European energy market. As a world-class facility, it was with great pride that EVT selected Ledwood to spearhead the steel structure installation and piping prefabrication for the new LNG tank, ensuring seamless integration with the existing facility.
Liam Revell further expressed his appreciation for being entrusted with such a critical role, stating, “It’s a real vote of confidence by the industry in our skills and expertise.”
Ledwood Mechanical Engineering stands as an independent company specializing in engineering, fabrication, and construction, with a proven track record of successfully delivering complex projects across the oil, gas, process, and energy sectors.
The expansion of Europe’s largest LNG terminal signifies a significant milestone in the energy landscape, reinforcing the UK’s position as a key player in the global LNG market. With Ledwood at the helm of this transformative project, the nation can look forward to enhanced energy infrastructure, fostering a more sustainable and secure future for all.
READ THIS WEEK’S PEMBROKESHIRE HERALD HERE:News
BBC apologises to Herald’s editor for inaccurate story
THE BBC has issued a formal apology and amended a six-year-old article written by BBC Wales Business Correspondent Huw Thomas after its Executive Complaints Unit ruled that the original headline and wording gave an “incorrect impression” that Herald editor Tom Sinclair was personally liable for tens of thousands of pounds in debt.

The 2019 report, originally headlined “Herald newspaper editor Tom Sinclair has £70,000 debts”, has now been changed.
The ECU found: “The wording of the article and its headline could have led readers to form the incorrect impression that the debt was Mr Sinclair’s personal responsibility… In that respect the article failed to meet the BBC’s standards of due accuracy.”
Mr Sinclair said: “I’m grateful to the ECU for the apology and for correcting the personal-liability impression that caused real harm for six years. However, the article still links the debts to ‘the group which publishes The Herald’ when in fact they related to printing companies that were dissolved two years before the Herald was founded in 2013. I have asked the BBC to add that final clarification so the record is completely accurate.”
A formal apology and correction of this kind from the BBC is extremely rare, especially for a story more than six years old.
Business
First wind turbine components arrive as LNG project moves ahead
THE FIRST ship carrying major components for Dragon LNG’s new onshore wind turbines
docked at Pembroke Port yesterday afternoon last week, marking the start of physical
deliveries for the multi-million-pound renewable energy project.
The Maltese-registered general cargo vessel Peak Bergen berthed at Pembroke Dock on
shortly after 4pm on Wednesday 26th November, bringing tower sections and other heavy
components for the three Enercon turbines that will eventually stand on land adjacent to the
existing gas terminal at Waterston.
A second vessel, the Irish-flagged Wilson Flex IV, has arrived in Pembroke Port today is
due to arrive in the early hours of this morning (Thursday) carrying the giant rotor blades.
The deliveries follow a successful trial convoy on 25 November, when police-escorted low-
loader trailers carried dummy loads along the planned route from the port through
Pembroke, past Waterloo roundabout and up the A477 to the Dragon LNG site.
Dragon LNG’s Community and Social Performance Officer, Lynette Round, confirmed the
latest movements in emails to the Herald.
“The Peak Bergen arrived last week yesterday with the first components,” she said. “We are
expecting another delivery tomorrow (Thursday) onboard the Wilson Flex IV. This will be
blades and is currently showing an ETA of approximately 03:30.”
The £14.3 million project, approved by Welsh Ministers last year, will see three turbines with
a combined capacity of up to 13.5 MW erected on company-owned land next to the LNG
terminal. Once operational – expected in late 2026 – they will generate enough electricity to
power the entire site, significantly reducing its carbon footprint.
Port of Milford Haven shipping movements showed the Peak Bergen approaching the Haven
throughout Wednesday morning before finally tying up at the cargo berth in Pembroke Dock.
Cranes began unloading operations yesterday evening.
The Weather conditions are currently were favourable for this morning’s the arrival of
the Wilson Flex IV, which was tracking south of the Smalls at midnight.
The abnormal-load convoys carrying the components from the port to Waterston are
expected to begin early next year, subject to final police and highway approvals.
A community benefit fund linked to the project will provide training opportunities and energy-
bill support for residents in nearby Waterston, Llanstadwell and Neyland.
Further updates will be issued by Dragon LNG as the Port of Milford Haven as the delivery
programme continues.
Photo: Martin Cavaney
Crime
Banned for 40 months after driving with cocaine breakdown product in blood
A MILFORD HAVEN woman has been handed a lengthy driving ban after admitting driving with a controlled drug in her system more than ten times over the legal limit.
SENTENCED AT HAVERFORDWEST
Sally Allen, 43, of Wentworth Close, Hubberston, appeared before Haverfordwest Magistrates’ Court on Thursday (Dec 4) for sentencing, having pleaded guilty on November 25 to driving with a proportion of a specified controlled drug above the prescribed limit.
The court heard that Allen was stopped on August 25 on the Old Hakin Road at Tiers Cross while driving an Audi A3. Blood analysis showed 509µg/l of Benzoylecgonine, a breakdown product of cocaine. The legal limit is 50µg/l.
COMMUNITY ORDER AND REHABILITATION
Magistrates imposed a 40-month driving ban, backdated to her interim disqualification which began on November 25.
Allen was also handed a 12-month community order, requiring her to complete 10 days of rehabilitation activities as directed by the Probation Service.
She was fined £120, ordered to pay £85 prosecution costs and a £114 surcharge. Her financial penalties will be paid in £25 monthly instalments from January 1, 2026.
The bench—Mrs H Roberts, Mr M Shankland and Mrs J Morris—said her guilty plea had been taken into account when passing sentence.
-
Crime2 days agoDefendant denies using Sudocrem-covered finger to assault two-month-old baby
-
Crime1 day agoPembroke rape investigation dropped – one suspect now facing deportation
-
Crime6 days agoMan denies causing baby’s injuries as police interviews read to jury
-
News1 day agoBaby C trial: Mother breaks down in tears in the witness box
-
Crime2 days agoLifeboat crew member forced to stand down after being assaulted at Milford pub
-
Crime2 days agoDefendant denies causing injuries to two-month-old baby
-
Crime2 days agoPembrokeshire haven master admits endangering life after speedboat collision
-
Crime9 hours agoMother admits “terrible idea” to let new partner change her baby’s nappies alone






