Politics
Simon Hart joins two key committees

SIMON HART MP has been voted by his fellow MPs on to the parliamentary committee that investigates Digital, Culture, Media and Sport in the UK.
He has also been appointed by No 10 to the Committee on Standards for Public Life (CSPL), which advises the Prime Minister on ethical standards among public office holders.
The CSPL looking into intimidation experienced by Parliamentary candidates during elections – a subject raised by Mr Hart after the recent General Election.
“The Digital, Culture, Media and Sport committee is deciding which areas to investigate but it is likely to be topics surrounding athlete classification in the Paralympics,” said Mr Hart.
“I was delighted to be voted on to the committee as it covers a lot of areas in which I am very interested such as rural broadband and mobile coverage as well as topics that I have been campaigning on, such as online bullying.
“It is also an honour to be appointed as the Conservative member on the CSPL, we have already heard some very interesting evidence regarding the bullying and intimidation of candidates during the last election. This was a very real problem and I am pleased that the Prime Minister has acted so swiftly in ordering the investigation.”
Community
Fishguard natural burial site plans refused by planners

A CALL to extend a Pembrokeshire cemetery to provide a space for eco-friendly natural burials has been refused by county planners.
A natural burial is an eco-friendly alternative to traditional burial, burying a body in the ground without a coffin or headstone.
In an application to Pembrokeshire County Council, the Trustees of Tabernacle Chapel sought permission for a change of use of agricultural land to extend the existing Tabernacle Cemetery, Fishguard to include a natural burial site.
A supporting statement, through agent Gethin Beynon, said the land has been in the cemetery ownership since 1945, adding: “Based on the development forming a similar use to the adjacent cemetery and being in the same ownership as the Trustees of Tabernacle Chapel, the proposal would be classed as an extension to an existing community facility.
“As the development is not proposing any engineering or physical features with the natural habitat being retained, it is considered the change of use of the land would be in keeping in an area where other cemeteries exist to the north, east and west of the application site.”
It added: “With regard to the operation of the burial ground, when a burial takes place, a plot is allocated, and the turf cut and set aside. The topsoil and subsoil are then heaped alongside the grave. The graves would be dug to the appropriate depth to earth over the coffin to protect it whilst allowing the body to recycle in the active/living layer of the soil.
“After a burial, soil is returned in compacted layers around and on top of the coffin, with topsoil and turf on top. Grave locations are plotted and recorded on plan. It is intended that such administration and management duties of the site would be undertaken by the applicants.
“Due to the development not resulting in marked graves and there being no maintenance requirements from mourners, visits and any associated vehicle movements would be of a low intensity and infrequent.”
The application was supported by Fishguard and Goodwick Town Council, subject to satisfactory outcomes of an archaeological survey in relation to nearby Castell Mwrtach, an Iron Age defended enclosure and possible associated earthworks, along with discussions with the south Wales Trunk Road Agency.
An officer report, recommending refusal, said Natural Resources Wales (NRW) had raised concerns “that cemeteries have the potential to cause pollution to controlled waters, with the level of risk dependent on many factors and to fully assess potential impact of each site an initial Tier 1 assessment which shall define potential pathways and receptors in proximity of the site,” adding: “No such risk assessment has been submitted in support of this application resulting in a development that does not adequately confirm the level of risk to controlled waters the development poses.”
Archaeological advisors Heneb has said a geophysics survey of the site is needed to determine any effect on adjacent to Castell Mwrtach.
“As a geophysics survey has not been submitted in support of the application, it cannot be demonstrated that the development would have an acceptable impact on the historic environment in conflict [with policy].”
The scheme was refused by planning officers on the grounds of the concerns raised.
News
Renovation of historic Tenby hotel given the green light

WORKS to a prominent listed Pembrokeshire hotel have been given the go-ahead by national park planners.
In an application to Pembrokeshire Coast National Park, Simon Fry, through agent Asbri Planning, sought listed building consent for works to the Grade-II-listed 1-2 Royal Lion Hotel, High Street, Tenby, said to be one of the oldest hotels in the town.
The works included replacement windows, replace window with original door opening, works to existing parapet, blocking up of windows, render front elevation, blocking up of existing windows, retain existing signage, remove and rebuild existing chimney stack and other minor ancillary works.
The proposals were supported by Tenby Civic Society: “We welcome the scheme, being done very much in character with the original and will complete a very welcome refurb enhancing this prominent point in the town”
It had requested some “minor corrections,” including “retaining the ‘stage door’ stained glass window on the rear door onto Upper Frog Street”.
Tenby Town Council also supported the scheme, saying it was “a much-desired enhancement of a Grade-II-listed building within the Conservation Area”.
A supporting statement for the application said: “In terms of the replacements and overall works these would be of sympathetic materials appropriate to its setting, ensuring the existing character of the building is preserved. The intention is to replace on a like-for-like basis where possible, although the new replacements will be double glazed.”
It added: “The works are necessitated following the previous structural survey undertaken on the two ground floor bays which revealed they are in poor condition and are in need of reinstatement as soon as possible in the interests of the integrity of the listed building and for public safety.
“The replacement of the other bay structures and windows on the front and northern side elevations were also necessitated given their deterioration over time which has led to an adverse visual impact on the listed building and surrounding area.
“Given the previous state of the bays and windows, the works that have been recently undertaken are a significant betterment to the existing situation, and the works the subject of this application would further enhance the quality of the listed building, avoiding further dilapidation.”
Last year, an Urgent Works Notice was served for works on the hotel by Pembrokeshire Coast National Park Authority, with an application for those works later granted.
The latest application added: “The building in question is of great significance to the town of Tenby and its Conservation Area. It stands as one of the oldest hotels in Tenby and as identified above, holds great historic and heritage merit.”
News
Herons Reef Residential Home redevelopment approved

A CALL to change a Pembrokeshire estuarial beauty spot village care home to a residential property has been approved by the national park.
In an application to Pembrokeshire Coast National Park, Leicestershire-based Mr c Cunningham sought permission for a change of use of Herons Reef Residential Home, Llangwm Ferry, Guildford Row, Llangwm, near Haverfordwest.
Previous applications have been made at the site for a change of use, with a 2019 scheme refused, and a 2018 scheme withdrawn.
Other applications for a single storey cabin-style building with decking area and an extension were also refused in 2011 and 2009 respectively.
An officer report, recommending approval of the current application, said: “No external changes are proposed to the building; however, it should be noted that stone cladding has been applied to the front elevation of the property within the last four years.
“Permission would have been required for this since, at the time of writing, the property is still within use class C2 [residential home] for which no permitted development rights exist. This will be dealt with separately to the current submission.
“There are no over-riding concerns in relation to the proposed change of use in relation to visual or residential amenity, and there are no concerns in relation to the parking arrangements, access or local Highway Network.
“The proposed green infrastructure and biodiversity enhancements are deemed to be acceptable as it is proposed to plant six new trees within the rear garden area, and this is deemed to be proportionate to the proposed development, since no losses are to occur to facilitate development.
“Overall, the proposal is considered to be acceptable, and a recommendation to grant permission, subject to conditions, is made.”
The application, which includes a Section 106 legal agreement for the payment of a contribution towards affordable housing, was conditionally approved by park planners.
-
News5 days ago
Driver lies injured in rain for hours at Fishguard Port after fall from lorry
-
Health7 days ago
Pembrokeshire ‘Pink Puffins’ race the Cleddau thanks to local vet’s vision
-
Charity4 days ago
Businessman ‘honoured’ to become Wales Air Ambulance’s first business ambassador
-
News5 days ago
Festival pulls appearance by ex-MP despite acclaim for honest memoir
-
Charity3 days ago
Charity distances itself from viral post as £4,000 theft claim goes viral
-
Crime5 days ago
Two Pembrokeshire vape shops face court closure orders
-
Community16 hours ago
Warning after suspected drug-related incidents in Haverfordwest
-
Top News7 days ago
National cultural landmark threatened with downgrade by National Park