Business
Transport for Wales services to be impacted by industrial action
THE MAJORITY of Transport for Wales (TfW) services across the Wales and Borders network will be suspended on two days in October due to the on-going national industrial action.
The National Union of Rail, Maritime, and Transport Workers (RMT) has announced two days of strike action will take place on Saturday 1 and Saturday 8 October, across Network Rail and 15 train operators.
ASLEF has also announced strike action on Saturday 1 and Wednesday 5 October across 12 train operators, while TSSA have announced strike action on 1 October at Network Rail and 11 train operators.
TfW is not involved in this industrial action, but as a result of the dispute between unions and Network Rail, TfW will be unable to operate a number of rail services on Network Rail infrastructure on 1 and 8 October, while some services will be much busier than usual on 5 October.
More information about the industrial action can be found on the TfW website.
Saturday 1 and Saturday 8 October – very limited rail service, do not travel by train
The only services operating will be on the Core Valley Lines in South Wales and a Cardiff to Newport shuttle, with one train operating hourly in each direction, between 07:30 and 18:30.
No other TfW services across Wales and the Borders network will be able to operate.
Train services will operate between Cardiff Central and Rhymney, Treherbert, Aberdare and Merthyr Tydfil in an hourly service in each direction between 07:30 and 18:30.
Customers are reminded there will be very limited road transport capacity between Radyr and Cardiff before 07:30 and after 18:30, when TfW is unable to operate trains via Llandaf and Cathays.
Amended timetables for Saturday 1 October will be in online journey planners from Tuesday 27 September.
Friday 30 September and Friday 7 October (the days before the strikes)
There is also expected to be disruption on the days prior to the industrial action, and services will be much busier than usual.
Customers are advised to only travel if necessary on Friday 30 September and 7 October, and to check online journey planners for any short-notice late night service alterations as a result of the following day’s strike action.
Core Valley Lines – Saturday 1 and Saturday 8 October
The first services of the day that depart Treherbert, Aberdare and Merthyr Tydfil will all be timed so they will be arriving into Radyr after 07:00. No trains will run before 07:00 on any lines except between Treherbert, Aberdare, Merthyr Tydfil – Radyr.
No pre-planned road transport services will be in operation before 18:30 on Core Valley lines.
Services are likely to be much busier than usual – particularly the first services of the day.
All other TfW services – Sunday 2 and 9 October
No trains will run before 07:00 on these days, and those trains that do run are likely to be much busier than usual – particularly the first services of the day. There is also expected to be disruption to services due to trains being displaced from the previous day’s strike action.
In particular, services to Cardiff are expected to be busier than usual on the morning on 2 October due to the Cardiff Half-Marathon.
Customers are urged to check the TfW website, app or social media before they travel, particularly for the first services of the day from their station of origin.
Services on these days are to be extremely busy and customers are encouraged to travel via the alternative dates of Monday 3 or 10 October.
Wednesday 5 October
Some of our services are likely to be extremely busy as a result of the severely-reduced timetable put in place by other operators. This includes:
- Services between Carmarthen and Newport
- Services between Shrewsbury and Wolverhampton
- Services between Cardiff and Cheltenham
- Services between Chester and Holyhead
- Services between Chester and Manchester Airport
- Services between Crewe and Manchester Piccadilly
Due to the closure of Birmingham New Street station, services between North Wales and Birmingham International will terminate at Wolverhampton.
Customers are advised to only travel if necessary and customers are encouraged to travel via the alternative dates of Tuesday 4 or Thursday 6 October.
Amended timetables for Wednesday 5 October will be in online journey planners from Thursday 29 September.
Existing tickets
Advance ticket holders are entitled to change their journey using the ‘Book with Confidence’ and the change of journey fees should be waived if applied before 18:00 the day before travel. You’re still able to change your tickets after this time, and up until the departure, but a change of journey fee of £10 will apply to each ticket changed.
Customers with Anytime, Off-Peak or Advance tickets, also Ranger/Rover tickets, for a TOC on strike – dated for 1, 5 or 8 October are permitted to travel either on the day before the date on the ticket or up to 11 October 2022.
If you have a return ticket and cannot make your outward journey because of a strike, you’re permitted a refund on your ticket even if the latter is not affected by a strike. The same applies if the return journey is affected by a strike but the outward was not.
Alternatively, customers can claim a full refund, with no admin fee charged. Season ticket holders can apply for compensation via Delay Repay.
Business
Holyhead closure: Storm damage could delay reopening until March
HOLYHEAD port faces an extended closure following significant storm damage, with fears it may not reopen until March. The disruption has caused widespread consequences for trade, travel, and postal services across the Irish Sea.
The Terminal 3 berth, used by Irish Ferries, sustained extensive damage during Storm Darragh earlier this month. Drone footage revealed a ‘dolphin’ platform had fallen into the sea, exacerbating the situation and impacting the adjoining terminal used by Stena Line.
Currently, all sailings are suspended until January 15, though experts warn this date may be overly optimistic. Garrett Bridgeman, managing director of An Post, Ireland’s national postal service, said: “I don’t think January 15 looks like the date. If you look at the level of work that needs to be done and the safety checks required afterwards, February or March seems more realistic.”
Stena Line stated their priority remains resuming operations safely, while the Marine Accident Investigation Branch (MAIB) is conducting an inquiry into the incident. A spokesperson for MAIB confirmed inspectors are reviewing evidence to understand the circumstances that led to the damage.
The Welsh Government has implemented contingency plans, with additional sailings arranged from Wales and the Mersey area despite challenging weather conditions. Welsh Transport Minister Ken Skates said: “This is a challenge we have never faced before, but we’ll continue working with UK and Irish governments to support businesses and travellers.”
Increased pressure on Fishguard and Pembroke ports
With Holyhead out of action, Pembrokeshire’s ports—Fishguard and Pembroke Dock—are facing increased pressure to handle additional sailings. Stena Line and Irish Ferries have already announced extra services from these ports to help ease the disruption.
Irish Ferries has confirmed it will launch a new service from Fishguard, while Pembroke Dock is also experiencing heightened activity with extra crossings scheduled. Passengers and freight operators are urged to check ferry company websites for the latest updates.
Cabinet Secretary for Transport and North Wales Ken Skates praised the efforts of ferry operators and local authorities in managing the surge in activity at Pembrokeshire’s ports. “Both Fishguard and Pembroke Dock are playing a crucial role in maintaining the flow of goods and passengers across the Irish Sea during this unprecedented disruption,” he said.
Local authorities and Transport for Wales are working to ensure traffic flows smoothly around these ports, with additional measures in place to minimise congestion and delays.
Meanwhile, the Irish Road Haulage Association (IRHA) has expressed growing frustration with the lack of clear communication from Holyhead Port authorities. IRHA President Ger Hyland said: “We need correct and true information with a definite timeline. The piecemeal updates have been unhelpful.”
Hyland highlighted the financial toll on hauliers, with some operators facing losses of up to €3,000 per vehicle weekly. He urged ferry companies to increase their efforts to ease the crisis and called on the Irish government to explore financial compensation for affected businesses.
The situation has been escalated to UK Prime Minister Keir Starmer, with calls for direct intervention to expedite repairs and alternative arrangements. Minister of State James Lawless, who met with haulage industry leaders, acknowledged the urgent need for clarity and support.
With Pembrokeshire ports now under increased strain, stakeholders are closely monitoring the situation, awaiting updates from Stena Line in mid-January.
Business
Derelict Cilgerran house to be transformed into cafe
PLANS by a village shop owner to convert a house “in a state of disrepair” to a café to “improve the variety of community facilities” locally have been given the go-ahead.
Mrs Morris, through agent Harries Planning Design Management, sought permission from Pembrokeshire County Council to convert The Old Post House, High Street, Cilgerran, currently a four-bed dwelling, to a ground floor café, along with a first-floor flat.
The application received five letters of support, saying it would provide local jobs, support the community, promote Welsh and local food, and provide a local community hub, with three letters of objection, raising concerns about parking and traffic, and potential odours from the premises.
A supporting statement, through the agent, said: “The proposed site is currently a dwellinghouse, in current need of modernisations and renovations throughout. The site is under the same ownership as the neighbouring village stores Siop Y Pentre,” saying the proposal “can be read as an extension to the existing Siop Y Pentre”.
“Siop Y Pentre is a thriving local community village shop which acts as a village hub. The shop provides local residents with day-to-day necessities, with a focus on local, sustainable and minimal waste products,” the statement says, adding the dwelling it seeks to convert “is in disrepair and in need of internal works to make suitable for modern living”.
It went on to say: “The proposed café seeks to retain its focus on local and seasonal produce with minimal waste and would provide a welcomed opportunity for socialising, especially during the daytime. The café will also seek to employ local staff retaining a community feel throughout. As such, the principle of the café adjacent to the existing village store is considered acceptable. The site seeks to encourage a sustainable community, with development of an appropriate scale and nature.
“Further to this, the location of the development is within the settlement boundary and seeks to fulfil a need for day-time socialising environments currently lacking within Cilgerran.”
The application was conditionally approved by county planners.
Business
Ferry Terminal ‘extremely busy’ due to ongoing Holyhead closure
PEMBROKE DOCK Ferry Terminal has been experiencing significant congestion today as ferry services remain under immense pressure following the closure of Holyhead Port earlier this month.
The disruption, caused by storm damage, has rerouted ferry traffic through Pembrokeshire, leading to long queues and crowded facilities at the terminal.
The Herald can confirm that it has been very busy today with cars, lorries, and foot passengers queuing in large numbers. Staff are working tirelessly to manage the influx, directing vehicles and assisting passengers as they prepare to board the heavily booked ferries.
A spokesperson for the Port of Milford Haven said: “We are working closely with ferry operators and local authorities to ensure traffic flows as smoothly as possible, but the sheer volume of vehicles is causing unavoidable delays.”
Travelers are being urged to arrive early for their sailings and to remain patient as the terminal operates at full capacity.
Both Stena Line and Irish Ferries have increased capacity on their Pembrokeshire routes, deploying larger vessels, including the Stena Adventurer and the MV James Joyce, to handle the surge in demand.
From our position at the terminal, our photographer has captured photos showing long lines of vehicles, groups of foot passengers carrying luggage, and port staff coordinating efforts to ease congestion.
Authorities are advising non-essential travelers to consider rescheduling their journeys where possible and to monitor updates from ferry operators closely.
(Photos: Martin Cavaney/Herald)
-
News5 days ago
Ferry accident causes delay on new Dublin-Fishguard route
-
Education6 days ago
Home Education: Delays and missed opportunities risk further tragedy
-
Business6 days ago
Pembrokeshire care home group hit by £150,000 budget blow
-
News7 days ago
Rift between Neyland councillors now ‘as wide as Grand Canyon’
-
Community6 days ago
Tips for coping with Mental Health challenges this Christmas
-
Business4 days ago
Ferry Terminal ‘extremely busy’ due to ongoing Holyhead closure
-
Health7 days ago
Hoax calls reach three-year high, says Welsh Ambulance Service
-
Entertainment6 days ago
River-themed lanterns light up Cardigan in spectacular parade