News
Plans underway for grant funding bid to reopen popular path
PEMBROKESHIRE COUNTY COUNCIL is finalising plans to bid for Welsh Government funding to repair and reopen the recently closed Wiseman’s Bridge to Saundersfoot path.
The popular route, which is also a section of the National Cycle Route 4, had to be closed on safety grounds following landslips in November, December and most recently February.
Pembrokeshire County Council understands the concern among residents about local access and that a plan is needed to address the issue with landslides attributed to heavy rainfall over recent months.
Shared use path cliff stabilisation works will be discussed at Cabinet on March 11th, which will include a focus on possible funding.
The route also forms part of the National Cycle Network Route 4, and is one of the longest in the UK. Annual visitors along the route totalled 481, 684 in 2023 and was vital in supporting the local economy within Saundersfoot.
The Council has been working closely with Welsh Government, and the Welsh Active Travel Board to submit a bid application for funding works to restore the link.
There was a recent visit to Saundersfoot to view walking and cycling routes within the village, along with the landslide area.
It is anticipated that a bid for Welsh Government funding within the Active Travel scheme to help cover the cost of the remedial work required can be submitted.
This will include not only clearing the area, but to also undertake engineering safety works to re-stabilise the cliff in the affected areas.
In conjunction with Pembrokeshire Coast National Park Authority (PCNPA), a second funding application could be submitted via the National Parks Partnership Cycling Projects Fund.
In the meantime, there is continued risk of further rock falls and the public are asked to respect the closure of the path and avoid the area.
Business
First wind turbine components arrive as LNG project moves ahead
THE FIRST ship carrying major components for Dragon LNG’s new onshore wind turbines docked at Pembroke Port yesterday afternoon, marking the start of physical deliveries for the multi-million-pound renewable energy project.
The Maltese-registered general cargo vessel Peak Bergen berthed at Pembroke Dock shortly after 4pm on Wednesday, bringing tower sections and other heavy components for the three Enercon turbines that will eventually stand on land adjacent to the existing gas terminal at Waterston.
A second vessel, the Irish-flagged Wilson Flex IV, is due to arrive in the early hours of this morning (Thursday) carrying the giant rotor blades.
The deliveries follow a successful trial convoy on 25 November, when police-escorted low-loader trailers carried dummy loads along the planned route from the port through Pembroke, past Waterloo roundabout and up the A477 to the Dragon LNG site.
Dragon LNG’s Community and Social Performance Officer, Lynette Round, confirmed the latest movements in emails to the Herald.
“The Peak Bergen arrived yesterday with the first components,” she said. “We are expecting another delivery tomorrow (Thursday) onboard the Wilson Flex IV. This will be blades and is currently showing an ETA of approximately 03:30.”
The £14.3 million project, approved by Welsh Ministers last year, will see three turbines with a combined capacity of up to 13.5 MW erected on company-owned land next to the LNG terminal. Once operational – expected in late 2026 – they will generate enough electricity to power the entire site, significantly reducing its carbon footprint.
Port of Milford Haven shipping movements showed the Peak Bergen approaching the Haven throughout Wednesday morning before finally tying up at the cargo berth in Pembroke Dock. Cranes began unloading operations yesterday evening.
Weather conditions are currently favourable for this morning’s arrival of the Wilson Flex IV, which was tracking south of the Smalls at midnight.
The abnormal-load convoys carrying the components from the port to Waterston are expected to begin next week, subject to final police and highway approvals.
A community benefit fund linked to the project will provide training opportunities and energy-bill support for residents in nearby Waterston, Llanstadwell and Neyland.
Further updates will be issued by Dragon LNG as the Port of Milford Haven as the delivery programme continues.
Photo: Martin Cavaney
Crime
Banned for 40 months after driving with cocaine breakdown product in blood
A MILFORD HAVEN woman has been handed a lengthy driving ban after admitting driving with a controlled drug in her system more than ten times over the legal limit.
SENTENCED AT HAVERFORDWEST
Sally Allen, 43, of Wentworth Close, Hubberston, appeared before Haverfordwest Magistrates’ Court on Thursday (Dec 4) for sentencing, having pleaded guilty on November 25 to driving with a proportion of a specified controlled drug above the prescribed limit.
The court heard that Allen was stopped on August 25 on the Old Hakin Road at Tiers Cross while driving an Audi A3. Blood analysis showed 509µg/l of Benzoylecgonine, a breakdown product of cocaine. The legal limit is 50µg/l.
COMMUNITY ORDER AND REHABILITATION
Magistrates imposed a 40-month driving ban, backdated to her interim disqualification which began on November 25.
Allen was also handed a 12-month community order, requiring her to complete 10 days of rehabilitation activities as directed by the Probation Service.
She was fined £120, ordered to pay £85 prosecution costs and a £114 surcharge. Her financial penalties will be paid in £25 monthly instalments from January 1, 2026.
The bench—Mrs H Roberts, Mr M Shankland and Mrs J Morris—said her guilty plea had been taken into account when passing sentence.
Local Government
Sewage leak at Pembroke Commons prompts urgent clean-up works
Council pollution officers say they have no enforcement powers over Welsh Water infrastructure
SEWAGE contamination on the Commons in Pembroke has prompted an urgent response from pollution officers, after a leak was reported by a member of the public on Tuesday.
Pembrokeshire County Council’s Pollution Control Team confirmed they were alerted yesterday afternoon to sewage surrounding a manhole cover on the site. The Herald understands that officers immediately notified Welsh Water (DCWW) network technicians to investigate the incident “as a matter of urgency”.
County councillor Jonathan Grimes, who represents Pembroke St Mary South and Monkton, said the authority had been clear that it holds no enforcement powers over Welsh Water assets.
“Whilst we work constructively with Welsh Water, we have no authority to intervene on their apparatus or to carry out enforcement action against them for such pollution incidents,” the Pollution Control Team said in a statement shared with the councillor.
Urgent works underway
Council officers visited the site on Wednesday morning alongside contractors and Welsh Water technicians to assess clean-up options. According to the team, works will include cleaning the contaminated ground in and around the manhole cover and fencing off the affected area “until safe”.
Cllr Grimes said officers would return to the scene on Thursday to check on progress and ensure the area is properly secured.
Residents who notice any further issues have been urged to contact the Pollution Control Team directly.
Further updates are expected later this week.
-
Crime2 days agoDefendant denies using Sudocrem-covered finger to assault two-month-old baby
-
Crime1 day agoPembroke rape investigation dropped – one suspect now facing deportation
-
Crime6 days agoMan denies causing baby’s injuries as police interviews read to jury
-
News1 day agoBaby C trial: Mother breaks down in tears in the witness box
-
Crime2 days agoLifeboat crew member forced to stand down after being assaulted at Milford pub
-
Crime2 days agoDefendant denies causing injuries to two-month-old baby
-
Crime2 days agoPembrokeshire haven master admits endangering life after speedboat collision
-
Crime8 hours agoMother admits “terrible idea” to let new partner change her baby’s nappies alone







