News
Train carrying diesel derails near Murco
At just after 10.35pm on Wednesday an EWS Class 66 locomotive operated by DB Schenker Rail left the tracks along with the first fuel wagon, but remained generally upright, at a twenty degree angle to the tracks.
The Pembrokeshire Herald spoke to Rob Smith from DB Schenker Rail who said: “The incident occurred on the catch-points where the railway branches from the main line to the refinery. There is a recovery team at the scene, which will need to lift the train as all wheels have left the tracks.”
“There is around thirty metres of railway damaged due to the derailment but no spillage of diesel fuel has occurred” he added.
Dyfed-Powys Police spokesman told The Herald: “Police at Milford Haven can confirm that emergency services attended the track near to the Steynton railway bridge where a derailment of a slow moving engine took place late on Wednesday evening.
“No persons were injured as a result and the road has been closed between Steynton and Tiers Cross in order for Rail Track engineers to right the engine.”
A spokesperson from the refinery said in a prepared statement: “Murco Petroleum Limited can confirm that shortly after 22.35hrs, a train carrying petroleum products from Murco’s Milford Haven Refinery derailed in the Steynton area of Milford Haven, approximately 1.5 miles from the Refinery.”
The spokesperson added: “There were no injuries sustained or loss of product from the train as a result of the incident. Network Rail has now assumed control of the incident and recovery of the train, following emergency response by the police and fire services. Murco is assisting Network Rail and the train operating companies in the recovery process and subsequent investigation into the cause of the derailment.”
DB Schenker Rail added: “We are also currently investigating the cause of the incident.”
The event comes only months after a Texaco road tanker, also carrying diesel, collided with a mobile crane spilling diesel onto the road in Merlins Bridge, Haverfordwest.
News
First Minister challenged over ‘£9bn cost’ of 20mph speed limit policy
A REFORM Wales MS launched a sharp attack on the Welsh Government’s default 20mph speed limit policy during an exchange with the First Minister in the Senedd on Tuesday.
South Wales East regional MS Laura Anne Jones criticised the policy, arguing that it has damaged the Welsh economy and ignored public opposition.
Speaking in the chamber, Ms Jones said improvements in vehicle safety had already contributed to a reduction in road casualties across the UK.
“Road casualties have gone down right across the United Kingdom because cars are getting safer. It is a known fact,” she told the Senedd.
She went on to question the economic impact of the Welsh Government’s 20mph policy, claiming official analysis suggests it could cost the Welsh economy around £9 billion.
“It needs to be asked: has this ill thought out policy already cost our country a lot of money? Yes. Will it cost an awful lot to reverse? Yes. But how much has it cost our Welsh economy? By the Government’s own calculations, this has cost £9 billion,” she said.
“So you cannot say it has been a good policy. It has been a disaster from start to finish.”
Ms Jones also referred to the record-breaking Senedd petition calling for the policy to be scrapped, which attracted around 500,000 signatures — the largest petition ever submitted to the Welsh Parliament.
She added that there is broad agreement that 20mph limits should apply in specific locations.
“No one across this Chamber disagrees that 20mph should be the case outside schools and hospitals and where it is appropriate. It is disingenuous to say anything else.
“But this default 20mph policy needs to be reversed.”
Reform Wales has pledged to scrap the default 20mph speed limit if elected at the next Senedd election, scheduled for May 7.
Community
Rail upgrades to improve journeys on Whitland to Pembroke Dock line
Buses to replace trains for one week as engineers carry out track work and Tenby station accessibility improvements
PASSENGERS travelling on the railway between Whitland and Pembroke Dock will face temporary disruption later this month while major engineering works are carried out to improve the line and upgrade facilities at Tenby Station.
Network Rail has confirmed that buses will replace trains for one week from Monday, March 16, while essential work takes place across the route.
The railway between Whitland and Pembroke Dock will be closed from 11:00pm on Sunday (March 15) until 5:45am on Saturday (March 21), allowing engineers to safely complete a programme of track renewal and maintenance works.
The upgrades form part of Network Rail’s ongoing investment in the West Wales line, aimed at improving reliability while also delivering accessibility improvements for passengers using Tenby Station.
Track renewal and maintenance
During the closure, engineers will carry out track renewal work between Whitland and Narberth, alongside a range of maintenance tasks across the route.
Planned works include vegetation management, fencing repairs, level crossing maintenance, and inspections of earthworks and other railway infrastructure.
Network Rail says the work is designed to strengthen the long-term reliability and resilience of the railway for the communities and passengers who depend on the line.
Accessibility improvements at Tenby
At the same time, significant accessibility improvements will take place at Tenby Station through the UK Government’s Access for All programme.
The project will eventually deliver a fully accessible footbridge with lifts, making it easier for disabled passengers, those with reduced mobility, parents with pushchairs and travellers carrying luggage to move between platforms.
As part of the work, the existing footbridge will be demolished overnight on Saturday, March 14.
A temporary scaffold footbridge will then be installed the same weekend to ensure passengers can continue to access both platforms.
Further construction activity will take place between March 16 and March 21 while the railway line is closed.
Travel advice for passengers
During the engineering works, replacement buses will operate instead of trains between Whitland and Pembroke Dock.
Passengers are being urged to check their journeys in advance and allow extra time for travel.
The latest journey information is available on the National Rail website and through Transport for Wales’ website and mobile app.
Mark Dix, Lead Portfolio Manager at Network Rail Wales and Borders, said: “These track upgrades and supporting works are essential to maintaining a safe and reliable railway for passengers across West Wales, while the improvements at Tenby Station will make a real difference for passengers who rely on step-free access.
“We would like to thank passengers, residents and local businesses for their patience while we carry out this important work.”
Crime
Driver caught with three illegal drugs in system on way to MOT test
Tenby stop check revealed cocaine and cannabis in motorist’s blood
ATTEMPTS to take his vehicle for its annual MOT has backfired after the vehicle’s owner was found to be driving with a cocktail of illegal drugs in his system.
Bradley Bostock, 27, was stopped by officers on December 16 as he drove his Ford Fiesta along Heywood Lane, Tenby.
But further investigations by officers confirmed he had 108 mcg of benzoylecgonine in his system together with 17 mcg of cocaine and 2.4 mcg of Delta-9 tetrahydrocannabinol. The legal limits are 50, 10 and 2 respectively.
“There’s no detail of the rationale behind why he was stopped, but three drugs were noted in his blood,” said Crown Prosecutor Sian Vaughan when Bostock appeared before Haverfordwest magistrates this week.
Bostock pleaded guilty to three charges of drug driving and was represented in court by Jess Hill.
“He was taking his vehicle to Tenby for an MOT that day but was stopped by officers for a stop check,” she said.
“He’s from Yorkshire and often feels isolated here as he has no family and uses drugs to help deal with his loneliness.”
Bostock, of Corston Cottages, Axton Hill, Pembroke was sentenced to a 12 month community order during which he must complete 10 rehabilitation activity requirement days and 90 hours of unpaid work.
He was disqualified from driving for 17 months and ordered to pay a £114 court surcharge and £85 costs.
-
Community5 days agoWhitland Post Office re-opens under new management
-
Health2 days agoWomen’s health services ‘expanding’ across mid and west Wales says Health Board
-
Crime5 days agoMan who threatened to kill police during Milford Haven standoff avoids jail
-
Health7 days agoDavies and Kurtz attack ‘fantasy hospital’ pledge for west Wales
-
Ministry of Defence7 days agoWelsh pride HMS Dragon to sail to shield UK’s Cyprus base
-
Crime6 days agoMan sentenced after punching convicted paedophile in Haverfordwest pub
-
Crime6 days agoA teenage driver sentenced after pedestrian seriously injured on zebra crossing
-
Crime7 days agoFraudsters posing as police officers target residents in cash and card scam









