Business
Council and Ogi invest in future-ready connectivity at Pembrokeshire Innovation Centre
Upgrade at Bridge Innovation Centre aims to give local businesses faster, more reliable and scalable digital infrastructure
PEMBROKESHIRE COUNTY COUNCIL and Welsh broadband provider Ogi have invested in a major full fibre upgrade at Pembroke Dock’s Bridge Innovation Centre, in a move aimed at supporting business growth and strengthening the county’s digital infrastructure.
The project, announced under embargo until Thursday (Apr 16), replaces the site’s ageing legacy connection with a dedicated business-grade full fibre network designed to meet the needs of modern companies.
A high-capacity symmetrical core connection has been installed, supported by a secondary fibre route to improve resilience. The upgrade is intended to give businesses based at the centre the reliability and capacity they increasingly need as standard.
Ogi engineers said that the job took around two and a half weeks, and represented a major project for the installation team.
Full fibre has also been extended throughout the building, with each office now able to access its own dedicated connection. This means businesses can increase their internet speeds as they expand, without the need for further building work or disruption.
Ogi Chief Executive Officer Sally-Anne Skinner said: “Digital infrastructure shouldn’t be something businesses have to worry about. It needs to be dependable, flexible and ready to grow when they are. That’s exactly what we’ve put in place here.”
The new network has also been built with security and resilience in mind. Managed firewall protection, intelligent traffic management and round-the-clock monitoring have been introduced to help keep services secure and performing effectively, while battery backup systems will protect critical equipment during power interruptions.
Shared spaces within the Innovation Centre have also benefited from improved connectivity, with new high-performance WiFi designed to cope with busy working days, events and collaborative use throughout the building.
Pembrokeshire County Council said the investment is about more than simply improving internet speeds. It is also intended to ensure the Bridge Innovation Centre continues to meet the changing needs of businesses at different stages of development.
Peter Lord, the council’s Principal Officer for Business Development, said: “What businesses tell us they value most is confidence. They want to know the infrastructure around them won’t limit their plans – and this investment gives them that reassurance.”
The council believes the upgrade will help strengthen Pembrokeshire’s appeal as a base for ambitious firms looking to grow sustainably while remaining rooted in the local area.
Sally-Anne added: “When the right infrastructure is already in place, it makes staying and growing locally a much easier decision. That’s how you support long-term economic growth – by giving businesses what they need from day one.”
Ogi said the installation forms part of a wider programme to support business communities across Wales through full fibre networks and managed services designed for long-term use in real working environments.
Photo caption:
Bridge Innovation Centre in Pembroke Dock has received a major full fibre connectivity upgrade (Pic: Supplied).
Business
Tenby Loungers Lansio Lounge work done without permission
A RETROSPECTIVE call for works associated with the new Loungers beachfront venue in Tenby has been given the go-ahead.
In an application approved by Pembrokeshire Coast National Park, Loungers UK Limited, through agent Richard Pedlar Architects, sought retrospective permission for new fascia signage, a new wall-mount menu board and a free-standing menu board at the new Loungers based at the former Salty’s Beach Bar and Restaurant, Battery Road.
Back in January, UK-wide hospitality company Loungers plc announced it was planning to open a new beachfront Lansio Lounge at Tenby’s South Beach, with the promise of 30 jobs created, on March 25.
Lansio Lounge is based at the former Salty’s Beach Bar and Restaurant on Water’s Edge, South Beach.
The announcement for the Loungers plans for the former Salty’s Beach Bar and Restaurant were revealed shortly after the application to Pembrokeshire Coast National Park for Loungers signage at Salty’s.
Family-run venue Salty’s Beach Bar and Restaurant announced its closure on social media, confirming that Sunday, January 4 was its final day of trading.
An officer report recommending approval for the signage said the call for the retrospective installation and associated works “has attracted numerous third-party representations, primarily raising concerns in relation to potential light pollution and the colour treatment of the existing windows and doors”.
It went on to say consultation responses from relevant statutory consultees “confirm that the proposed halo illumination is acceptable and would not give rise to unacceptable levels of light pollution, nor would it adversely affect nearby designated sites or sensitive landscapes,” adding: “A planning condition has been attached, requiring the submission and approval of revised details to secure a more neutral colour finish for the external joinery and menu boards, to ensure an appropriate visual appearance in the context of the surrounding area.”
The application was conditionally approved by Park planners.
Business
Dragon LNG supports Neyland Heritage website launch
THE NEYLAND and Llanstadwell Heritage Group is pleased to acknowledge the support of Dragon LNG as a Founding Sponsor of its newly launched heritage website.
The website was officially launched at a special community event held at Neyland Hub on Wednesday, April 15, marking 170 years to the day since Isambard Kingdom Brunel brought the railway to Neyland in 1856.
As part of the evening, Dragon LNG presented a cheque in support of the project, recognising the importance of preserving and sharing the area’s rich local history.
The new website has been developed as a central and accessible resource to bring together research, stories, and historical material relating to Neyland and Llanstadwell. It is intended not only as a record of the past, but as a living resource that encourages community involvement and participation.
Carol Elliott, Chair of the Neyland and Llanstadwell Heritage Group, said: “We are extremely grateful to Dragon LNG for their generous support. Their contribution has helped make this website possible, ensuring that the history of Neyland and Llanstadwell can be preserved and shared with the community and with future generations.”
A spokesperson for Dragon LNG said: “Following a request from Gareth, a member of our Team, we are delighted to support the new Neyland Heritage Website, through our Staff Sponsorship programme, reflecting his valued involvement in the Neyland and Llanstadwell Heritage Group. We are proud to support initiatives that celebrate and preserve local heritage. This project reflects the strong sense of community in Neyland and Llanstadwell, and we are pleased to play a part in helping to make local history more accessible to all, particularly younger generations.”
Dragon LNG plays an important role within the local community, supporting a range of initiatives and organisations across Pembrokeshire. Their support for the heritage website reflects a continued commitment to community engagement and the promotion of local identity.
The Neyland and Llanstadwell Heritage Group hopes the website will become a lasting resource for residents, visitors, and schools, while also encouraging wider participation from the community in recording and sharing its history.
The new website can be viewed at: https://www.neylandhistory.org.uk/
Business
Narberth Kadinsky gallery to dental surgery refused
PLANS to convert a former art gallery to a dental surgery on the edge of a Pembrokeshire town have been refused.
In an application to Pembrokeshire County Council, Ahmed Abouserwel, through agent A.D Architectural Design Consultants LTD, sought permission for a change of use of the former Kadinsky gallery, Redstone Road, Narberth, to a dental surgery, along with associated works.
A supporting statement said: “The existing open plan gallery space will be transformed into the main dentist area, with a glazed internal lobby, leading directly into the open reception / waiting area. There will be five treatment rooms accessed directly off the reception, with a private archive room behind the reception desk.
“The rear lean-to projection will be extended to the north to accommodate a proposed decontamination room and to re-model the Staff area and W.C provision (number to remain as existing).”
It said the proposal would create 10 full and three part-time jobs.
An officer report recommending refusal said concerns were raised by the county Highways authority, who having assessed the application on safety, capacity and policy considerations, recommended the application be REFUSED on the grounds of insufficient evidence provided.
“The submitted design and access statement and block plan indicate on-site parking provision for 16 vehicles, located to the north and west of the building. The application form states that the site will employ 10 full-time staff and three part-time staff. However, the submission does not differentiate between practitioners and ancillary/support staff.”
It said, on planning guidance, health centres require three spaces per practitioner; and one space per three ancillary staff, adding: “As the applicant has not provided a breakdown of staff roles, the Highway Authority is unable to assess whether the proposed parking provision is adequate.”
It stressed: “Whist there is no in-principle objection to the redevelopment of this established site for a dental surgery, insufficient information has been provided to fully assess the proposal.”
It was refused on the grounds including it would lead “to the unjustified loss of an employment premises in a location which contributes to the local supply of employment land and buildings,” adding: “Insufficient evidence has been submitted to demonstrate that the building is no longer suitable or viable for continued employment use, nor that there is overriding community need to justify its loss.”
It was also refused on the grounds that “Insufficient information has been submitted to demonstrate that the development would operate without giving rise to unacceptable highway safety impacts or on street parking pressure”.
-
Business7 days agoA proper Pembroke local: Inside the warm welcome of The Old Cross Saws Inn
-
Business5 days agoMilford Haven dry dock pitched as home for giant £480m superyacht yard
-
Community7 days agoDoorstep warning issued after reports of suspicious callers in Pembrokeshire
-
Crime7 days agoRomino’s licence revoked after illegal workers found and fire risks exposed
-
Politics6 days agoWelsh Lib Dems promise childcare boost, social care reform in manifesto launch
-
News6 days agoHaverfordwest County AFC escapes winding-up order but ordered to pay costs
-
News6 days agoLabour split over Brawdy defence project as Eluned Morgan calls for project halt
-
Community6 days agoFamily safe after major house fire in Letterston, community told









